Modification of the stress-state of cable-stayed bridge due to staggered erection of their superstructure

In current practice, the effects of the evolutionary erection of cable-stayed bridge superstructure are rarely included into the simulation of its tensioning process. In fact, stay forces in service are usually defined in early stages of design, when the construction process has not even been concei...

ver descrição completa

Detalhes bibliográficos
Autores: Lozano Galant, José Antonio, Ruiz Ripoll, Lidia, Payá Zaforteza, Ignacio Javier, Turmo Coderque, José|||0000-0001-5001-2438
Formato: artículo
Fecha de publicación:2014
País:España
Recursos:Universitat Politècnica de Catalunya (UPC)
Repositorio:UPCommons. Portal del coneixement obert de la UPC
Idioma:inglés
OAI Identifier:oai:upcommons.upc.edu:2117/27292
Acesso em linha:https://hdl.handle.net/2117/27292
https://dx.doi.org/10.3846/bjrbe.2014.30
Access Level:acceso abierto
Palavra-chave:Cable-stayed bridges
cable-stayed bridge
erection
stay force
simulation
construction process
tensioning process
Ponts atirantats
Àrees temàtiques de la UPC::Enginyeria civil::Materials i estructures::Tipologies estructurals
Descrição
Resumo:In current practice, the effects of the evolutionary erection of cable-stayed bridge superstructure are rarely included into the simulation of its tensioning process. In fact, stay forces in service are usually defined in early stages of design, when the construction process has not even been conceived in detail yet. In order to fill this gap, the effects of the evolutionary erection of cable-stayed bridge superstructure throughout the tensioning process are studied in this paper. This study is focused on steel cable-stayed bridges erected on temporary supports. For the very first time a new criterion to include the effects of the evolutionary erection of cable-stayed bridges into the definition of the stay forces in the service state is presented.