Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting
Electricity-intensive industries are highly impacted by electricity prices and their fluctuations. While these industries can change their consumption profiles to avoid peak price periods, they must also adhere to production schedules dictated by their unique manufacturing processes and related cons...
| Authors: | , , , |
|---|---|
| Format: | article |
| Publication Date: | 2025 |
| Country: | España |
| Institution: | Universitat Politècnica de Catalunya (UPC) |
| Repository: | UPCommons. Portal del coneixement obert de la UPC |
| Language: | English |
| OAI Identifier: | oai:upcommons.upc.edu:2117/431132 |
| Online Access: | https://hdl.handle.net/2117/431132 https://dx.doi.org/10.1109/ACCESS.2025.3567879 |
| Access Level: | Open access |
| Keyword: | Balance responsible party Day-ahead market Day-ahead optimization Demand response Electricity markets Electricity price forecasting Flexibility services Àrees temàtiques de la UPC::Enginyeria elèctrica |
| id |
ES_cde328183ef00e7cf5ea58f8cc091bd0 |
|---|---|
| oai_identifier_str |
oai:upcommons.upc.edu:2117/431132 |
| network_acronym_str |
ES |
| network_name_str |
España |
| repository_id_str |
|
| spelling |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecastingCaprara, AdrianoBarja Martínez, Sara|||0000-0003-4126-8858Aragüés Peñalba, Mònica|||0000-0002-1509-376XBullich Massagué, Eduard|||0000-0003-4603-1868Balance responsible partyDay-ahead marketDay-ahead optimizationDemand responseElectricity marketsElectricity price forecastingFlexibility servicesÀrees temàtiques de la UPC::Enginyeria elèctricaElectricity-intensive industries are highly impacted by electricity prices and their fluctuations. While these industries can change their consumption profiles to avoid peak price periods, they must also adhere to production schedules dictated by their unique manufacturing processes and related constraints. Balance Responsible Parties (BRPs), seek to optimize the electricity costs of their portfolio of customers and have limited access to real-time industrial flexibility. So, the concept of Daily Industrial Flexibility (DIF) is introduced as a trade-off between real-time flexibility and predetermined industrial schedules. Each factory can propose different fixed day-ahead consumption profiles to the BRP, each with a specific activation cost. In this context, this paper proposes a day-ahead flexibility service to minimize the BRP’s costs of electricity purchase on the day-ahead market, activating DIFs within the portfolio of industrial customers. A forecasting model for the electricity price is implemented and an optimization model is formulated to minimize day-ahead portfolio costs. Finally, the case study of a Catalan BRP is presented, considering DIF offers from its largest customers. Results demonstrate that the proposed approach enables accurate predictions of the BRP’s customers operation before DAM closure, successfully identifying alternative schedules to reduce portfolio costs.Mònica Aragüés-Peñalba and Eduard Bullich-Massaguébelong to the Serra Húnter Programme. Views and opinionsexpressed are however those of the author(s) only and donot necessarily reflect those of European Union. NeitherEuropean Union nor the granting authority can be heldresponsible for them.Peer ReviewedInstitute of Electrical and Electronics Engineers (IEEE)20252025-05-0720252025-06-06journal articlehttp://purl.org/coar/resource_type/c_6501VoRhttp://purl.org/coar/version/c_970fb48d4fbd8a85info:eu-repo/semantics/articleapplication/pdfhttps://hdl.handle.net/2117/431132https://dx.doi.org/10.1109/ACCESS.2025.3567879reponame:UPCommons. Portal del coneixement obert de la UPCinstname:Universitat Politècnica de Catalunya (UPC)InglésengEuropean Commission http://doi.org/10.13039/501100000780 HE 101058657 Industrial Cluster FLEXibility platform for sustainable FACTories to reduce CO2 emissions and to enable the Energy Transitionopen accesshttp://purl.org/coar/access_right/c_abf2Attribution 4.0 Internationalhttp://creativecommons.org/licenses/by/4.0/info:eu-repo/semantics/openAccessoai:upcommons.upc.edu:2117/4311322026-05-27T15:37:01Z |
| dc.title.none.fl_str_mv |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| title |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| spellingShingle |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting Caprara, Adriano Balance responsible party Day-ahead market Day-ahead optimization Demand response Electricity markets Electricity price forecasting Flexibility services Àrees temàtiques de la UPC::Enginyeria elèctrica |
| title_short |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| title_full |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| title_fullStr |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| title_full_unstemmed |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| title_sort |
Flexibility service for balance responsible parties’ industrial customers: a day-ahead cost optimization approach using price forecasting |
| dc.creator.none.fl_str_mv |
Caprara, Adriano Barja Martínez, Sara|||0000-0003-4126-8858 Aragüés Peñalba, Mònica|||0000-0002-1509-376X Bullich Massagué, Eduard|||0000-0003-4603-1868 |
| author |
Caprara, Adriano |
| author_facet |
Caprara, Adriano Barja Martínez, Sara|||0000-0003-4126-8858 Aragüés Peñalba, Mònica|||0000-0002-1509-376X Bullich Massagué, Eduard|||0000-0003-4603-1868 |
| author_role |
author |
| author2 |
Barja Martínez, Sara|||0000-0003-4126-8858 Aragüés Peñalba, Mònica|||0000-0002-1509-376X Bullich Massagué, Eduard|||0000-0003-4603-1868 |
| author2_role |
author author author |
| dc.subject.none.fl_str_mv |
Balance responsible party Day-ahead market Day-ahead optimization Demand response Electricity markets Electricity price forecasting Flexibility services Àrees temàtiques de la UPC::Enginyeria elèctrica |
| topic |
Balance responsible party Day-ahead market Day-ahead optimization Demand response Electricity markets Electricity price forecasting Flexibility services Àrees temàtiques de la UPC::Enginyeria elèctrica |
| description |
Electricity-intensive industries are highly impacted by electricity prices and their fluctuations. While these industries can change their consumption profiles to avoid peak price periods, they must also adhere to production schedules dictated by their unique manufacturing processes and related constraints. Balance Responsible Parties (BRPs), seek to optimize the electricity costs of their portfolio of customers and have limited access to real-time industrial flexibility. So, the concept of Daily Industrial Flexibility (DIF) is introduced as a trade-off between real-time flexibility and predetermined industrial schedules. Each factory can propose different fixed day-ahead consumption profiles to the BRP, each with a specific activation cost. In this context, this paper proposes a day-ahead flexibility service to minimize the BRP’s costs of electricity purchase on the day-ahead market, activating DIFs within the portfolio of industrial customers. A forecasting model for the electricity price is implemented and an optimization model is formulated to minimize day-ahead portfolio costs. Finally, the case study of a Catalan BRP is presented, considering DIF offers from its largest customers. Results demonstrate that the proposed approach enables accurate predictions of the BRP’s customers operation before DAM closure, successfully identifying alternative schedules to reduce portfolio costs. |
| publishDate |
2025 |
| dc.date.none.fl_str_mv |
2025 2025-05-07 2025 2025-06-06 |
| dc.type.none.fl_str_mv |
journal article http://purl.org/coar/resource_type/c_6501 VoR http://purl.org/coar/version/c_970fb48d4fbd8a85 |
| dc.type.openaire.fl_str_mv |
info:eu-repo/semantics/article |
| format |
article |
| dc.identifier.none.fl_str_mv |
https://hdl.handle.net/2117/431132 https://dx.doi.org/10.1109/ACCESS.2025.3567879 |
| url |
https://hdl.handle.net/2117/431132 https://dx.doi.org/10.1109/ACCESS.2025.3567879 |
| dc.language.none.fl_str_mv |
Inglés eng |
| language_invalid_str_mv |
Inglés |
| language |
eng |
| dc.relation.none.fl_str_mv |
European Commission http://doi.org/10.13039/501100000780 HE 101058657 Industrial Cluster FLEXibility platform for sustainable FACTories to reduce CO2 emissions and to enable the Energy Transition |
| dc.rights.none.fl_str_mv |
open access http://purl.org/coar/access_right/c_abf2 Attribution 4.0 International http://creativecommons.org/licenses/by/4.0/ |
| dc.rights.openaire.fl_str_mv |
info:eu-repo/semantics/openAccess |
| rights_invalid_str_mv |
open access http://purl.org/coar/access_right/c_abf2 Attribution 4.0 International http://creativecommons.org/licenses/by/4.0/ |
| eu_rights_str_mv |
openAccess |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Institute of Electrical and Electronics Engineers (IEEE) |
| publisher.none.fl_str_mv |
Institute of Electrical and Electronics Engineers (IEEE) |
| dc.source.none.fl_str_mv |
reponame:UPCommons. Portal del coneixement obert de la UPC instname:Universitat Politècnica de Catalunya (UPC) |
| instname_str |
Universitat Politècnica de Catalunya (UPC) |
| reponame_str |
UPCommons. Portal del coneixement obert de la UPC |
| collection |
UPCommons. Portal del coneixement obert de la UPC |
| repository.name.fl_str_mv |
|
| repository.mail.fl_str_mv |
|
| _version_ |
1869419896134172672 |
| score |
15,812455 |