Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study

The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependent s...

Descripción completa

Detalles Bibliográficos
Autores: Ciavotta, Michele, Minella, Gerardo Gabriel, Ruiz García, Rubén
Tipo de recurso: artículo
Fecha de publicación:2013
País:España
Institución:Universitat Politècnica de València (UPV)
Repositorio:RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Idioma:inglés
OAI Identifier:oai:riunet.upv.es:10251/43117
Acceso en línea:https://riunet.upv.es/handle/10251/43117
Access Level:acceso abierto
Palabra clave:Scheduling
Permutation flow shop
Multi-objective
Sequence dependent setup times
Iterated greedy
ESTADISTICA E INVESTIGACION OPERATIVA
Descripción
Sumario:The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependent setup times are considered. As setup times and multi-criteria problems are important in industry, we must focus on this area. We propose a simple, yet powerful algorithm for the sequence dependent setup times flowshop problem with several criteria. The presented method is referred to as Restarted Iterated Pareto Greedy or RIPG and is compared against the best performing approaches from the relevant literature. Comprehensive computational and statistical analyses are carried out in order to demonstrate that the proposed RIPG method clearly outperforms all other algorithms and, as a consequence, it is a state-of- art method for this important and practical scheduling problem