The effect of dam construction on the movement of dwarf caimans, Paleosuchus trigonatus and Paleosuchus palpebrosus, in Brazilian Amazonia.

Run-of-the-river hydroelectric dams cause changes in seasonal inundation of the floodplains, and this may cause displacement of semi-aquatic vertebrates present before dam construction. This study evaluated the movement of crocodilians before and after the filling of the Santo Antonio hydroelectric...

Descripción completa

Detalles Bibliográficos
Autores: CAMPOS, Z., MOURAO, G., MAGNUSSON, W. E.
Tipo de recurso: artículo
Estado:Versión publicada
Fecha de publicación:2017
País:Brasil
Institución:Empresa Brasileira de Pesquisa Agropecuária (Embrapa)
Repositorio:Repositório Institucional da EMBRAPA (Repository Open Access to Scientific Information from EMBRAPA - Alice)
Idioma:portugués
OAI Identifier:oai:www.alice.cnptia.embrapa.br:doc/1080949
Acceso en línea:http://www.alice.cnptia.embrapa.br/alice/handle/doc/1080949
https://doi.org/10.1371/journal.pone.0188508
Access Level:acceso abierto
Palabra clave:Crocodilo
Barragem
Caiman
Paleosuchus palpebrosus
Paleosuchus trigonatus
Dams (hydrology)
Descripción
Sumario:Run-of-the-river hydroelectric dams cause changes in seasonal inundation of the floodplains, and this may cause displacement of semi-aquatic vertebrates present before dam construction. This study evaluated the movement of crocodilians before and after the filling of the Santo Antonio hydroelectric reservoir on the Madeira River in the Brazilian Amazon, which occurred in November 2011. We radio-tracked four adult male Paleosuchus palpebrosus and four adult male Paleosuchus trigonatus before and after the formation of the reservoir between 2011 and 2013. The home ranges of the P. palpebrosus varied from < 1 km2 to 91 km2 and the home ranges of the P. trigonatus varied from < 1km2 to 5 km2 . The species responded differently to time since filling and water level in weekly movement and home range. However, overall the dam appears to have had little effect on the use of space by the individuals that were present before dam construction.